Clean Utilities & Solution Preparation Turn Key Project

TK Project including Validation & Qualification Services.

Turnkey basis project (from Engineering and Construction to C&Q) on a installation for clean utilities and solution preparation in one of the LVP leaders’ facilities in Malaysia. Validation of the Siemens PCS7 SCADA distributed system controlling the process of 4 new Bottle pack Lines. (Project going along 4 years, one Bottle pack Line per year).

LOCATION
Malaysia

Scope

  • Basic & Detail Engineering
  • Construction Engineering
  • Manufacturing process system
  • Weighing system
  • Commissioning Plan, Validation Plan, Risk Assessment, URS, Commissioning for non-GMP systems, DQ, FAT, IQ, OQ, for the following system:
  • Cleanrooms
  • HVAC
  • Clean Utilities (WP, WFI, PS, Compressed air, Nitrogen, Vacuum Systems and Gases).